Click to enlarge map

 

GTP has developed two innovative design concepts for consideration in the environmental assessment.

GTP Concept A -
Express Toll Lane/Bus Rapid Transit (ETL/BRT)

This concept provides new express toll lanes (ETLs), on I-75/I-575. All tolls will be collected electronically, without toll booths. The existing lanes will remain free and benefit from reduced congestion as a result of those choosing to use the new ETLs. Of GTP's two concepts, Concept A has the lowest capital cost and the least change to the currently planned HOV/BRT project.

GTP Concept B -
ETL/BRT +Truck Only Toll
(TOT) Lanes

This concept adds to Concept A new truck-only toll lanes on I-75 that are mandatory for all "through-trucks" with three or more axles. Concept B results in the greatest relief to traffic congestion, accommodating long-term growth in the corridor. It also improves traffic safety by separating heavy trucks from automobile traffic.